Electrical Infrastructure Readiness Score
Score a facility's retrofit readiness across service size, panel capacity, long-lead electrical gear, controls, incentives, and commissioning.
No account required for this preliminary screen. Results are planning signals, not utility approval or engineering sign-off.
Score the facility
Populate from field audit, one-line, utility coordination, or pre-design notes.
Approximate spare breaker space or kW margin.
Based on current sourcing outlook.
BAS access, lighting control zones, and intent.
Use before relying on incentives in the proposal.
Closeout and acceptance testing readiness.
This is a preliminary planning signal. It does not establish utility approval, engineering sign-off, verified rebate eligibility, or a final design.